Synchronizing the reporting database

Configuring the report server settings is a system-wide setting that applies to all Control Compliance Suite (CCS) users.

You can choose to synchronize the reporting database immediately after certain jobs are completed.

To perform data synchronization

  1. Go to Settings > General.

  2. In the General view, on the left panel, click System Configuration > Reporting Synchronization.

  3. On the right panel, you can do the following:

    Check/uncheck jobs for synchronization

    You check or uncheck the jobs for the reporting database synchronization. By default, all the jobs are selected.

    If you uncheck any of the jobs, the corresponding job data is synchronized when the scheduled reporting data synchronization job is run.

    If you check any of the jobs, the corresponding job information is synchronized in the reporting database immediately after the jobs are completed.

    Synchronize Configuration to Integration Services Server

    Click this option to verify the connection to the computer that has the SQL Server with Integration Services (SSIS) installation.

    Synchronize Application Server Credentials

    Click this option to verify the authentication of the user connecting to the computer that has the SQL Server with Integration Services (SSIS) installation.