Editing a
report generation job
You edit a report
generation job in the Job view. The job can have only one scheduled
run in a 24 hour period. Any changes to the schedule overwrite the
existing schedule. If you select the option, the option does not affect the scheduled job
run. By default, the schedules begin on the current date and the
current time.
The Report type
determines which steps are available.
To edit a report generation job
-
In the Monitor > Jobs
view, existing jobs are shown in the table pane. Select a report
generation job.
-
Right-click and select
The wizard that is
associated with that report is launched.
-
Complete the wizard to
edit the report generation job.