Editing a report generation job

You edit a report generation job in the Job view. The job can have only one scheduled run in a 24 hour period. Any changes to the schedule overwrite the existing schedule. If you select the Run now option, the option does not affect the scheduled job run. By default, the schedules begin on the current date and the current time.

The Report type determines which steps are available.

To edit a report generation job

  1. In the Monitor > Jobs view, existing jobs are shown in the table pane. Select a report generation job.

  2. Right-click and select Edit job

    The wizard that is associated with that report is launched.

  3. Complete the wizard to edit the report generation job.